Receive your quote within 24 business hours

A few details about your site, your needs and your constraints β€” and we come back to you with a tailored, costed, no-commitment quote. You then decide internally, at your own pace.

  • Costed quote within 24 business hours
  • No commitment, no unsolicited sales follow-up calls
  • Direct reply from Marie, Paul or Gautier β€” not a call centre
  • Sliding-scale terms for multi-site accounts (5 sites and above)

They requested a quote from us this year

TotalEnergies
Vinci Facilities
Decathlon
Enedis
Legrand
FM Logistic
Leroy Merlin
Mondial Relay
Inside the quote

What you receive with your quote

1. A tailored hardware recommendation β€” Based on the information provided (smoking areas, footfall, exposure), we propose the best-suited ashtray model, costed by quantity, with colours and any options.

2. A line-by-line cost breakdown β€” Hardware, installation, collection frequency, material recycling, quarterly waste transfer note. No hidden cost: every item is shown clearly.

3. The commitment terms β€” Contract duration (typically 12 to 48 months, aligned with hardware amortisation), renewal conditions, multi-site mechanics where applicable.

4. The operational roadmap β€” Roll-out steps, installation lead times, points of contact, arrangements for the first collection round.

5. Comparable references β€” Where relevant, mention of clients we support on similar configurations (site size, sector, constraints).

What happens next

From form to signature, step by step

  1. 01

    You fill in the form (3 min)

    Your contact details, site context, constraints. No need to have all the technical details β€” we complete it by phone if necessary.

  2. 02

    Marie, Paul or Gautier calls you (within 24 business hours)

    15 to 20-minute conversation to understand your context: type of establishment, expected number of smoking areas, technical constraints (fixings, logistics access), CSR / regulatory stakes.

  3. 03

    You receive the detailed quote (within 24h)

    Costed PDF, ready to forward to your procurement or CSR department. You review it internally at your own pace. No follow-up without your explicit agreement.

  4. 04

    You decide (at your own pace)

    Approval, negotiation, competitive tender, postponement. You lead. If you decide to go ahead, installation fits into the following 2 to 4 weeks.

Still hesitating?

Three frequently asked questions

Does requesting a quote commit me to anything?

Not at all. You receive the quote, review it, decide. No follow-up sales call without your agreement, no intrusive mailing. If the quote doesn't suit you (or if it isn't the right moment), you keep it and we come back when you ask.

How quickly can I be equipped?

Allow 2 to 4 weeks between signature and the first on-site collection round. That covers hardware manufacture (Made in Picardie, so short-circuit but not instant), logistics scheduling with clikeco, and installation coordination. For multi-site projects, the roll-out can be staggered over 2 to 3 months depending on scope.

Would you prefer to start with a free audit?

If your need isn't yet clear, or if you want a field opinion from an expert before pricing, the free audit is the right entry point. An expert visits the site, maps your smoking areas, and gives you a costed report within 5 days. It is a no-commitment step that often clarifies internal trade-offs. See the audit page.

Ready to receive your quote?

3 minutes to fill in the form, 24 business hours for the reply.